Electrical, low-voltage and automation installation for custom home builders, from preconstruction through commissioning.

Equipment rooms, rack locations, structured wiring, shade pockets, lighting-control panels, conduit, gate pathways and technology loads are easiest to coordinate before framing closes. Early decisions protect schedule and prevent expensive field improvisation.

Lighting controls need branch circuits, shades need power and blocking, AV racks need dedicated loads, and gates need both electrical and low-voltage infrastructure. Regent5 coordinates those interfaces under one electrical and low-voltage team instead of leaving the builder to reconcile multiple vendors.

A coordinated set of low-voltage plans, device schedules, rack elevations, shade and lighting-control requirements, submittals and interface notes gives the field team the information needed to build and coordinate the work with related trades.

Racks need ventilation, concealed displays need structure and access, shade pockets affect glazing and ceilings, and devices touch finished elevations. We coordinate those requirements before they become late RFIs or punch-list conflicts.

Commissioning is a construction phase, not an afterthought. Networks, lighting, shades, security, AV and automation are tested together, scenes are tuned, labeling and records are updated, and the homeowner or estate team receives a structured handoff.

The builder’s reputation extends beyond move-in. Regent5 documents the systems, trains the owner or estate staff, establishes remote-management and service options, and remains available after the project team has demobilized.
Get started.
Share a few project details and the Regent5 team will follow up on goals, scope and next steps.
Prefer to talk? Call
(650) 242-5745

Regent5 supports builders and developers on San Francisco Bay Area and Northern California custom homes and private estates, coordinating preconstruction, electrical, low voltage, technology systems, commissioning and long-term homeowner support under one accountable team. Regent5 has over 15 years of experience designing, installing and servicing electrical and home automation systems.
The builder receives a coordinated technology scope that can be scheduled, roughed in, inspected, commissioned and handed over cleanly.
Scope, infrastructure, budgets, schedules and trade interfaces reviewed before construction locks in avoidable constraints.
Technology loads, lighting control, shades, racks, gates and resilient-power requirements coordinated with the electrical scope.
Device plans, structured-wiring pathways, rack elevations and system requirements translated into field-ready information.
Product data, dimensional requirements and field questions resolved against the architectural and engineering sets.
Framing, HVAC, millwork, glazing, ceilings and finish conditions coordinated before installation conflicts become rework.
Integrated testing, programming, scene tuning, labeling, documentation and homeowner or estate-team turnover.
Panels, circuits, pockets, blocking, controls and shade power coordinated before framing and finish work.
Structured wiring, fiber, access points, gates, cameras and security pathways built into the project rather than added late.
Space, power, cooling, clearances and service access coordinated before rooms and millwork are committed.
A support path after handover protects the builder from becoming the default technology service desk.
Where we work.
Regent5 supports builders and developers on San Francisco Bay Area and Northern California custom homes and private estates, providing coordinated electrical and low-voltage preconstruction, construction, commissioning and long-term service. Select engagements extend to Santa Barbara, the Los Angeles area, and Orange County.
Regent5 also works with general contractors on office and commercial build-outs.
Key items include rack and equipment-room locations, conduit and cable pathways, network backbones, speaker and display backing, shade pockets, lighting-control panels, cameras, gates, intercoms, door interfaces and the electrical requirements that support those systems. Large properties can be organized by building, construction phase and fiber backbone infrastructure.
Before framing and major rough-in decisions. Early preconstruction lets technology pathways, equipment spaces, electrical interfaces, shade pockets and visible devices be coordinated before they affect schedule or finishes.
By resolving system scope, equipment locations, pathways, loads, pockets, blocking and visible-device coordination before rough-in and finishes make those decisions expensive to change.
Yes. Regent5 coordinates electrical and low-voltage systems under one team where that scope fits the project, allowing power and technology interfaces to be resolved together.
Separate non-deferrable infrastructure from equipment that can be selected later. Regent5 can define pathways, wiring, equipment-room, network, security, lighting-control and power requirements early, then carry realistic category allowances so the builder can manage procurement, alternates and change impacts without holding up rough-in.
Yes. Integrated projects cross trade boundaries, so Regent5 can coordinate relevant interfaces with door hardware, mechanical, pool, landscape, glazing, shading, lighting and electrical teams to clarify power, control, network and pathway responsibilities.